Análise comparativa das tabelas de referência DER-SP e DNIT na orçamentação de obras rodoviárias
| dc.contributor.advisor | Lorenzini, Luca Gomes Pereira de Vilhena | |
| dc.contributor.author | Silva, Marcela Sant´ana da | |
| dc.contributor.event2 | São José dos Campos | |
| dc.contributor.referee | Yokoyama, Nara Oliveira | |
| dc.contributor.referee | Barbosa, Eduardo Aparecido | |
| dc.date.accessioned | 2026-07-08T14:18:16Z | |
| dc.date.available | 2026-07-08T14:18:16Z | |
| dc.date.issued | 2025 | |
| dc.description.abstract | Este estudo realiza uma análise comparativa entre as tabelas públicas de referência de custos do DER-SP (Departamento de Estradas de Rodagem do Estado de São Paulo) e do DNIT (Departamento Nacional de Infraestrutura de Transportes), aplicadas na orçamentação de obras rodoviárias. A pesquisa destaca a relevância da engenharia de custos para assegurar a viabilidade econômica e reduzir riscos de distorções financeiras em projetos de infraestrutura. Foram abordados conceitos como composição de preços unitários, Bonificação e Despesas Indiretas (BDI) e metodologias de cálculo. A metodologia envolveu pesquisa bibliográfica, seleção de uma obra real, atualização dos dados para a base de julho de 2025 e elaboração de orçamentos comparativos para as disciplinas de terraplenagem e pavimentação. Os resultados indicaram diferenças expressivas entre as tabelas, tanto na estrutura das composições quanto nos impactos financeiros: na terraplenagem, a variação aproximou-se de R$ 706 mil, enquanto na pavimentação superou R$ 16 milhões, uma variação de 10,46% e 33,58% respectivamente, influenciada por critérios regionais e metodologias distintas de cálculo do BDI. Conclui-se que a escolha da tabela impacta diretamente o custo final da obra, sendo essencial compreender suas premissas e limitações para garantir maior precisão, transparência e aderência às condições locais nos processos licitatórios. | |
| dc.description.abstract2 | This study presents a comparative analysis of the public cost reference tables provided by DER-SP (Department of Highways of the State of São Paulo) and DNIT (National Department of Transport Infrastructure), applied to the budgeting of road construction projects. The research emphasizes the importance of cost engineering in ensuring economic feasibility and minimizing financial distortions in infrastructure projects. Key concepts such as unit price composition, Bonus and Indirect Expenses (BDI), and calculation methodologies were addressed. The methodology involved a literature review, selection of a real project, updating data to the July 2025 base, and preparing comparative budgets for earthworks and paving disciplines. The results revealed significant differences between the tables, both in the structure of cost compositions and in financial impacts: for earthworks, the variation was approximately BRL 706 thousand, while for paving it exceeded BRL 16 million, mainly due to regional criteria and distinct BDI calculation methods. It is concluded that the choice of the reference table directly affects the final cost of the project, making it essential to understand its assumptions and limitations to ensure greater accuracy, transparency, and alignment with local conditions in bidding processes | |
| dc.description.physical | 84 p. | |
| dc.format.mimetype | ||
| dc.identifier.uri | https://repositorio.univap.br/handle/123456789/1220 | |
| dc.language.iso | pt_BR | |
| dc.publisher.country | Brasil | |
| dc.publisher.department | Bacharelado em Engenharia Civil | |
| dc.publisher.initials | UNIVAP | |
| dc.publisher.institution | Universidade do Vale do Paraíba | |
| dc.references | SILVA, Marcela Sant´ana da. Análise comparativa das tabelas de referência DER-SP e DNIT na orçamentação de obras rodoviárias. São José dos Campos, SP, 2025. 84 f.; 1 PDF. Trabalho de graduação (Engenharia civil) - Universidade do Vale do Paraíba, Faculdade de Engenharia, Arquitetura e Urbanimo, São José dos Campos/SP, 2025 | |
| dc.subject.keyword | Engenharia civil | |
| dc.subject.keyword | Orçamento | |
| dc.subject.keyword | Obras Rodoviárias | |
| dc.subject.keyword | Engenharia de Custos | |
| dc.title | Análise comparativa das tabelas de referência DER-SP e DNIT na orçamentação de obras rodoviárias | |
| dc.type | Trabalho de Conclusão de Curso |